Where the budget goes: a quote for 90 m²

We broke a real finishing quote down line by line. The tiles turned out not to be the most expensive item.

A flat’s finishing quote broken down line by line

A 90 m² flat in the Eixample: two bedrooms, two bathrooms, a kitchen-living room and a dressing room. Finishes and fittings only — no building work, and no furniture the client brought in themselves. Figures rounded to the hundred, shares calculated against the total.

Four lines that eat two thirds

People arrive with a budget for tiles and leave understanding that tiles are a quarter of it.

  1. 01 Surfaces Porcelain for the floors, the bathroom walls and the splashback — €21,400. Plus trimming and cutting: €2,900 on a line of its own, which is the one people forget.
  2. 02 Bathroom fittings Taps, sanitaryware, shower systems and concealed cisterns — €18,700. Half of it went on two taps and one shower column in the master bathroom.
  3. 03 Doors and partitions Eight flush leaves with frames and hardware — €16,200. More than all the bathroom furniture put together.
  4. 04 Lighting Thirty-four downlights, four pendants and a track system in the living room — €11,500. The pendants alone were a third of the line.
Cutting and trimming are a separate line. On large formats that is up to 15% of the price of the slab.
Cutting and trimming are a separate line. On large formats that is up to 15% of the price of the slab.

Where a quote usually lies

Three items almost always surface later. Delivery to a floor without a lift — from €300 to carry large-format slabs up by hand. Back boxes and boxes for flush doors: the electrician allows for them, the client buys them. And consumables — adhesive for large formats costs three times as much as the ordinary kind, and you need three times more of it.

A quote adds up right until the day the first 3200×1600 slab turns up on site.

The quote line by line

LineAmountShareWhat’s included
Surfaces€24,30027%slabs, cutting, adhesive
Bathroom fittings€18,70021%taps, sanitaryware
Doors€16,20018%leaves, frames, handles
Lighting€11,50013%downlights, pendants, track
The master bathroom took 34% of the fittings line on 9% of the floor area.
The master bathroom took 34% of the fittings line on 9% of the floor area.

How to use this

Proportions are steadier than sums. If surfaces come to 40% of your budget and lighting to 4%, the odds are the slab was chosen above the class of the project and the lighting was never costed at all. That is not a mistake, but it is better known before the order than after.

We prepare a breakdown like this before anything is signed: from your floor plan, with real product codes and current factory prices.

From the article

The brands in question

The main items in the quote came from these factories.

Porcelain, 27% of the quote

Taps and shower systems

Flush door hardware

Pendants and track lighting

We’ll break down your own numbers

Bring the floor plan and we’ll put together a line-by-line quote with real product codes and prices.

Book a visit

Or write to us: info@betton.es · +34 647 23 69 08

We use cookies

Some are needed for the site to work: language, the booking form, saved materials. The others show which materials get viewed most often — those you can switch off.

Cookie policy